FIVE YEAR CAPITAL IMPROVEMENTS PLAN   EQUIPMENT AND BUILDING IMP HIGHWAY    
    PRIOR YEARS APPROVED     CAPITAL 5 YEAR PROPOSED PROJECT        
  1st Line               TOTAL REVENUES
 Description Year Total 2000 2001 2002 2003 2004 2005 2006 2002-2006 2002-2006
                     
Truck Patrol /Plow and Wing 2000 1,414,702 94,702 277,500 189,000 283,500 190,000 190,000 190,000 1,042,500 0
Truck Tandem Axle Dump w/ Plow, Wing, Salt 2000 519,000 129,000   130,000   130,000   130,000 390,000 0
Truck Dump One Ton 2000 513,000 28,000 52,000 75,000 76,000 76,500 127,500 78,000 433,000 0
Wheel Loader with Plow 2000 291,000 97,500   98,500     95,000   193,500 0
Turf Mower 2000 147,000 43,000   18,000 17,000 17,000 17,000 35,000 104,000 0
Pickup Trucks 2001 157,000   38,000 19,000 61,000 16,000 23,000   119,000 0
Vac All Sweeper Cleaner 2001 152,000   152,000           0 0
Used Equipment Fund 2001 100,000   50,000 50,000         50,000 0
Used Mechanic Service Truck 2001 28,000   28,000           0 0
Diesel Truck Replacement Engines & Dump Box 2001 21,000   21,000           0 0
Automobile Mid-Size 2001 19,000   19,000           0 0
Ives Grove - Boiler Engineering & Replacement 2002 187,000     7,000 180,000       187,000 0
Ives Grove - Parking Lot Paving 2002 140,000     45,000 50,000     45,000 140,000 0
Motor Grader 2002 85,000     85,000         85,000 0
Ives Grove - Truck Storage Repair & Renovation 2002 30,000     30,000         30,000 0
Roadside Mower Tractor 2003 125,000       65,000   60,000   125,000 0
Rochester - Storage Building Roof 2003 100,000       100,000       100,000 0
Tractor Backhoe with Breaker 2003 96,000       96,000       96,000 0
Storm Water Utility District Assessment 2003 65,000       35,000 30,000     65,000 0
Skid Steer Utility Loader 2003 31,000       31,000       31,000 0
Engineer Field Vehicle 2003 27,000       27,000       27,000 0
One Ton Dump Truck Dual Fuel 2003