RACINE COUNTY CAPITAL PROJECT REQUEST Package Number:  T58
Capital Type: (Below) Project Title: Joint Dispatch
X Technology   Project Location: Proposed Joint Racine Dispatch Center
  Construction   Project Contact Person: Jim Scherff
  Equipment/Furniture   Department: Sheriff's Department Project ID:   
      Has this package been adjusted from prior year submission: (yes or no) no
      If this has been modified please identify where and why.
Scope and Description of Project (What)        
Text Box:  This package addresses the known costs for the new joint Dispatch Center, tentatively planned to be located in leased space in what is currently the City of Racine Dispatch Center.  This package is not complete.  It has the known technical costs and  physical plant costs.
 
               
               
               
               
               
               
Justification of Project (Why)          
Text Box: This package is being submitted to provide the costs related to the joint dispatch center project.  
               
               
               
               
               
Alternatives              
Text Box: The County will need either to implement the equipment in the joint dispatch center, or upgrade the current LEC based dispatch center, due to the age of the existing systems.
               
               
               
               
Impact of not accepting project          
Text Box: The current LEC- based dispatch center will not last much longer in its present condition.  Replacement parts are no longer made for the console equipment.
               
               
               
               
Budget Summary 2002 2003 2004 2005 2006 Total
Expenses/Detail              
Technical costs   1,966,690         1,966,690
Physical plant costs 801,110         801,110
Contingency   270,000         270,000
                 
Revenues/Sources            
Remote agency 5 year share            
                 
Net County Cost: 3,037,800 0 0 0 0 3,037,800
If the project contains more detail than can be supplied above please only put the summary information above
and attach a sheet showing the detail items.
               
Cost of Operating Expenses 2002 2003 2004 2005 2006 Total
Associated with Project:            
Operational Package Number for current year budget only: