RACINE COUNTY CAPITAL PROJECT REQUEST Package Number:  C86
Capital Type: (Below) Project Title: ROAD CONSTRUCTION CTH A
  Technology   Project Location: CTH J TO STH 75
X Construction   Project Contact Person: CECIL MEHRING
  Equipment/Furniture   Department: PUBLIC WORKS - HIGHWAY Project ID:  2003-03
      Has this package been adjusted from prior year submission: (yes or no) NO
      If this has been modified please identify where and why.
Scope and Description of Project (What)        
Text Box: Existing pavement would be pulverized and placed as additional base.  The prepared base would then be paved with a 4"-5" bituminous pavement.  We may also consider paving a portion of the gravel shoulders.  All cross culverts will be inspected and replaced as needed.  Intersection with CTH J will be reviewed and upgraded as required.  Between 45 - 50% of the project cost will be funded with State CHIP funds.
               
               
               
               
               
               
Justification of Project (Why)          
Text Box: The road was last paved in 1975.  The pavement is experiencing surface deterioration, cracking and rutting in the wheel paths.  There are a number of weak spots which have already been patched.  In 1996, the pavement received a rating of 5.0
               
               
               
               
               
Alternatives              
Text Box: Do nothing.
               
               
               
               
Impact of not accepting project          
Text Box: Continue to patch.  Place a thin overlay over existing surface, this will not get the desired service life out of the pavement overlay.
               
               
               
               
Budget Summary 2002 2003 2004 2005 2006 Total
Expenses/Detail     600,000       600,000
                 
                 
                 
                 
Revenues/Sources   (270,000)       (270,000)
                 
                 
Net County Cost: 0 330,000 0 0 0 330,000
If the project contains more detail than can be supplied above please only put the summary information above
and attach a sheet showing the detail items.
               
Cost of Operating Expenses 2002 2003 2004 2005 2006 Total
Associated with Project:            
Operational Package Number for current year budget only: