RACINE COUNTY CAPITAL PROJECT REQUEST Package Number:  E81
Capital Type: (Below) Project Title: REPLACE TRAY LINE
  Technology   Project Location: RIDGEWOOD CARE CENTER
X Construction   Project Contact Person: TERRY KILMER
x Equipment/Furniture   Department: DIETARY Project ID:   
    Has this package been adjusted from prior year submission: (yes or no)  
    If this has been modified please identify where and why.
Scope and Description of Project (What)        
Text Box: Remove and replace the existing tray-line.  Incorporate built in, designed steam tables and a self contained booster heater. Update power supplied to unit.  A study of the kitchen has been requested to determine the most efficient design.

 
               
               
               
               
               
               
Justification of Project (Why)          
Text Box: The tray-line is old with parts that are obsolete.  This unit was brought from High Ridge and its use has evolved by necessity. The tray-line is problematic and has seen many years of hard use. Repairs require extensive retrofit of parts, with many no longer available.
               
               
               
               
               
Alternatives              
Text Box: None
 
               
               
               
               
Impact of not accepting project          
Text Box: Continued high costs of repair, possible down time, and possible urgent replacement.  
               
               
               
               
Budget Summary 2002 2003 2004 2005 2006 Total
Expenses/Detail     300,000       300,000
                 
                 
                 
                 
Revenues/Sources            
                 
                 
Net County Cost: 0 300,000 0 0 0 300,000
If the project contains more detail than can be supplied above please only put the summary information above
and attach a sheet showing the detail items.
               
Cost of Operating Expenses 2002 2003 2004 2005 2006 Total
Associated with Project:            
Operational Package Number for current year budget only: